Most of the cost is decided before the first stud arrives on site.

The usual explanation for a gap between two quotes is that one company is more expensive. That is rarely the truth. Far more often both are pricing slightly different things, and a layperson cannot see it, because what arrives at the end is a single figure for a house.

We do not publish prices here; it would be pointless, since any figure without a design, a plot and a scope is invented. What can be described is where the cost is made.

The scope, that is, where the quote ends

The biggest difference between quotes is usually not the margin but where the delivery stops. One quote covers the house including floors, tiling and paint; another puts a house with bare floors in the same box. A third adds a kitchen; a fourth leaves out landscaping and utility connections, which on a sloping plot is no detail.

That is why the scope of delivery belongs in the quote as an itemised list, including what it does not cover.

The shape of the house

You do not pay for square metres, you pay for corners, transitions and details. A bungalow with a simple gable roof and a rectangular footprint is far simpler than an equally large house with dormers, a bay and a cantilever over the terrace. Every break means more cuts, more flashing, more airtightness details and more hours.

If you are looking for a saving without giving up quality, the shape of the house is the most effective place to find it.

The plot and the foundations

Two otherwise identical houses on two plots are not the same job. The slope, the bearing capacity, the water table, access for machinery and the distance to connections all decide. All of that is learned from a site visit and a ground investigation, not from a map.

Foundations are then the first item that changes once the investigation is in. So it pays to do the investigation before you start comparing quotes: a lump sum for foundations is the most common hidden item that later gets revised upwards.

Wall assembly and insulation standard

The difference between a standard and a low energy build is not only insulation thickness. Board types change, so does the demand on detailing and airtightness, and often the building services too. A quote that does not list the assembly cannot be compared with one that does.

How the assemblies differ and why polystyrene is not used on a vapour-open wall is covered separately.

Building services

Heat recovery ventilation, a heat pump, photovoltaics and cooling can move the cost of a house considerably. They are also the items most often decided during construction, because financing or a subsidy application is tied to them. The Czech Nová zelená úsporám programme exists, but its conditions change over time, so we do not quote amounts or call deadlines here and recommend checking the current wording before you apply.

What you do yourself

Self-build can move the figure, but it moves responsibility too. If you take on the finishing trades, expect the warranty to be split and some mistakes, above all damage to the airtight layer, to be expensive to put right. A shell makes sense if you know who will carry on.

In short

Before you compare two figures, compare two scopes. When the scopes differ, the figures say nothing. When the scope is the same and the figures still differ, it is worth asking why, and the answer is usually in the foundations, the assembly or the window standard.

Building, or thinking about it?

The more specific the brief, the more specific the answer. It helps to know whether you already have a design, what state the plot is in, and whether you want a turnkey house or only the shell.

We pass your enquiry to a building company that works in your area. If we have none there, we say so straight away instead of leaving you waiting.