A timber frame house is a structure where most of the quality disappears under the surface within a few weeks. What is inside the wall cannot be checked once it is boarded over. So the company is chosen before signing, not during construction.
Nine questions worth asking
- Which assembly do you propose and whyThe answer should name the type, the materials and the reason. It is a proven system is not an answer.
- Which layer forms the airtight planeIn a vapour-open assembly the boards on the inner side, in a closed one the vapour barrier. The company should know this without thinking.
- Will you measure airtightnessAnd at what stage. A test after the finishes are on is only a status report.
- Where will the services runThe right answer mentions a service cavity.
- What exactly is includedAsk for an itemised list, not one figure for a house.
- How is shading and summer comfort designedA lightweight structure overheats without shading. Anyone who does not raise it is not planning for it.
- How do payments workStages tied to work completed, not a large deposit up front.
- What is the warranty on, and for how longA warranty on the structure, on the finishes and on supplied equipment are three different things.
- Will I get as-built documentationIncluding photographs of concealed structures. You will value this years later.
Warning answers
This is not about catching anyone out. It is that these sentences usually mean the detail is not being watched:
- The wall breathesDiffusion is not ventilation and air should not flow through the wall. Anyone who conflates the two probably has not thought airtightness through.
- I can give you the exact price right nowWithout a design and a plot it is an estimate that will be revised. A fast figure is marketing, not a quote.
- We do not measure airtightness, we do it properlyMeasuring is the only way to find out.
- We will insulate it with polystyreneOn a vapour-open assembly that is a mistake that shows up years later.
- The warranty is above standardWithout saying what it covers and what it excludes, that is a word without content.
What to check outside the conversation
Look at references where you can see documentation, not only photographs of the finished house. A finished house always looks good; what is interesting is how it looked at the moment the wall was closed. Ask whether you can visit a house under construction. A company with nothing to hide usually has no problem with that.
And ask who specifically will build. The way we work is that we pass the enquiry to a company that works in your area, and we tell you who it is. If we have nobody there, you find out straight away.
The contract
The contract should set out the scope, a staged schedule, payments tied to completed stages, how changes are handled and the handover conditions including documentation. Changes are made in writing, and the cheapest ones are those that arrive before the relevant layers are covered up.
If you are unsure about the scope, go through the turnkey scope list and the boundary of a shell. Two quotes then become much easier to compare.